WP9: Transmitter development

Lead: IRF
IRF 30 months, EISCAT 4 months

In this work package, important parts of the EISCAT_3D radar transmitter subsystem are designed and evaluated. These particular areas of the transmitter design were planned to be addressed already during the FP6 Design Study were left unfinished because of a lack of manpower and time.

WP9 was intended to be a limited activity, following up on work done in the FP6 design study. The work has been finalized more than a year ago.