Milestone 6.4: Annual review of the evolving performance specification

The integrated performance specification is kept under continuous review with regular iterations to incorporate developments in the other Work Packages. The current version of the document is posted annually as a deliverable of Work Package 6.

The delivery of the second version of the integrated Performance Specification is Milestone 6.4. This document was produced in October 2012, but was not accepted by the EISCAT_3D Executive Board until November 2013. Thus Milestone 6.4 was reached in November 2013.