Milestone 13.1: Report on the networking requirements and provision aspects to the identified sites task completed

Task 13.1 of the EISCAT_3D Preparatory Phase project was to determine how to address the networking requirements for the EISCAT_3D system, using existing fibre networks as far as possible.

This Milestone was reached in July 2013 and results are included in a document prepared by EISCAT for the EGI project in August 2013.

See: www.eiscat3d.se/content/e-infrastructure-eiscat3d