Deliverable 2.1: Signed agreements on frequency allocations

In the original plan, the ongoing discussions on frequency allocations in Norway, Sweden and Finland was to be concluded at an early stage in the project. It has turned out that a change in the strategy for obtaining frequency allocations is needed compared to what was originally thought. Because the negotiations involve simultaneous discussions with agencies from three countries, they need to be performed on a level which lies beyond the scope of the EISCAT_3D Preparatory Phase and will thus take place outside the project

This means that Deliverable 2.1 will not be produced inside the EISCAT_3D Preparatory Phase project, since the negotiations will take place elsewhere.