Deliverable 12.2: Final report on WP12 activities

The tasks of this Work Package were designed to facilitate the next evolutionary steps in EISCAT system control. Deliverable 12.2 is the final report of the activities related to this aim.

AttachmentSize
PDF icon EISCAT_3D System Control Report740.34 KB